Glencore Ravensworth Hillcrest Offset Property
Principal Client
Glencore Australia
Head Contractor
B&K Revegetation & Landscaping
Location
Hunter Valley
Duration
4 Weeks
scope of works
Global Soils were engaged by Glencore Australia’s Ravensworth Operations to undertake gully erosion repairs to their Hillcrest Offset Property. The scope involved:
- Construction of 600m of contour banks designed to divert runoff for the prevention of further soil erosion;
- Reshaping of severe gully erosion to stabilise batters and allow water to flow more smoothly minimising ongoing erosion risks – approx. 1.5ha;
- Regrading and shaping multiple areas with sheet erosion – approx. 8.5ha;
- Supply and spread of approx. 100T of gypsum over eroded areas to improve soil structure;
- Hydromulching 1.5ha of reshaped gully to assist stabilisation while promoting native vegetation establishment;
- Direct seeding approx. 8.5ha of areas with a tailored mix of native species; and
- Cultivation of all areas to increase water infiltration, reduce runoff and provide a suitable medium for seeding and hydromulching
Global Soils delivered over 200 hectares of aerial seeding and fertilising of large rehabilitation areas at Glencore’s Glendell operation located in the Upper Hunter Valley.
Being an end-to-end management service for mine site rehabilitation, our in-house specialists provided collection, supply, treatment, and mixing of local provenance seeds.
Our project delivery team deployed the seed mix via helicopter using protocols developed and proven by GSS to be a safe, effective, and cost-efficient revegetation technique for mine sites.
- • Bush Regeneration • Hydromulching • Mine Site Rehabilitation • Revegetation • Soil Management
Global Soils
Glencore Ravensworth Hillcrest Offset Property
Global Soils were engaged by Glencore Australia’s Ravensworth Operations to undertake gully erosion repairs to their Hillcrest Offset Property. The scope involved:
- Construction of 600m of contour banks designed to divert runoff for the prevention of further soil erosion;
- Reshaping of severe gully erosion to stabilise batters and allow water to flow more smoothly minimising ongoing erosion risks – approx. 1.5ha;
- Regrading and shaping multiple areas with sheet erosion – approx. 8.5ha;
- Supply and spread of approx. 100T of gypsum over eroded areas to improve soil structure;
- Hydromulching 1.5ha of reshaped gully to assist stabilisation while promoting native vegetation establishment;
- Direct seeding approx. 8.5ha of areas with a tailored mix of native species; and
- Cultivation of all areas to increase water infiltration, reduce runoff and provide a suitable medium for seeding and hydromulching
Global Soils delivered over 200 hectares of aerial seeding and fertilising of large rehabilitation areas at Glencore’s Glendell operation located in the Upper Hunter Valley.
Being an end-to-end management service for mine site rehabilitation, our in-house specialists provided collection, supply, treatment, and mixing of local provenance seeds.
Our project delivery team deployed the seed mix via helicopter using protocols developed and proven by GSS to be a safe, effective, and cost-efficient revegetation technique for mine sites.
See More Projects
Contact Us
Contact B&K Group Australia now via our contact form or directly through the below head office contact details:
- 02 4384 4159
- info@thebkgroup.com.au
- 6 Apprentice Dr, Berkeley Vale NSW 2261